A lot has happened since the last blog entry. The big rolling turd is looking better and better with each passing day. We put in the final pieces of the sub floor that went under the bunk room, and I think those were the easiest ones to put in.
The next step was to buy and put in a floor, so we decided on sheet vinyl. Not my first pick, but the easiest one to work with and it is growing on me.
The vinyl went in very easy!
The results! Not bad, huh?
We also had a new helper today, thank goodness cuz this stapler would of been smashed into thousands of pieces. It would work for about 3 staples, then had to be taken apart !!!!! What a pain, the men stapled the edges of the vinyl and around the tank holes. Special thanks to Paps, who is always there when we need him :)
And here is the other helper, working his magic
After the floor went down Andy was so excited, it was like a weight had been lifted off of him. So we went ahead and put in the Kitchen cabinet. It barely fits in the camper door and had to go in before the bathroom wall was put up. The benches for the dining table went in too. We, (me) briefly thought about putting in a real table with chairs, but in the end it just doesn't make sense with our large family right now, maybe further down the road.
Then Andy just went nuts, he started cutting holes in the floor for the water lines and tub drain. And just a bunch of little things that have to get done.
He also started to fix the wall that we had taken apart. He left that for 2 days and it never set, the glue just ate away at the foam board, (I told him that foam needs special glue, no one listens to me), although in his defense the adhesive he used did say it worked on foam. So now we have ordered special Polystyrene glue and will put that up in the next day or two, hopefully.